Winthrop was awarded the mechanical element of the fitout works at the Ernst & Young offices in Dublin 3. The works comprised of the upgrade of the HVAC system to include.
• New Air Conditioning plant
• Ventilation services upgrade throughout the building
• A full kitchen and all associated services.
• Upgrade to all the roof plant.
• Upgrade to water services and Hot water systems
SCOPE OF WORKS: Mechanical Services
VALUE: €1,200,000
DURATION: 12 Months
PROJECT TEAM
ARCHITECT: Stride Treglown
CONSULTING ENGINEER: Ethos Engineering
MAIN CONTRACTOR: Sisk