↑ Return to Commercial

Google Block R, Dublin

google_416x416 East Point Business Park

 

 

 

 

 

 

Winthrop has recently been awarded the mechanical fit out to 3 floors of Google Offices at Block R Eastpoint Business Park, Dublin. The works entail the full strip-out of existing HVAC services, upgrading of HVAC systems to include new high specification VRV plant, new comms room air conditioning, and a full ventilation services upgrade.

Works to include:

•    Full new VRV air conditioning systems throughout all including new indoor and outdoor units.
•    Upgrade to the installation ventilation plant.
•    New comms room air conditioning
•    New kitchens and tea stations.

SCOPE OF WORKS:  Mechanical Services
VALUE:  €650,000
DURATION:  10 Weeks

PROJECT TEAM
ARCHITECT:  MOLA Architecture
CONSULTING ENGINEER:  Ethos Engineering
QUANTITY SURVEYOR:  Gardiner & Theobald
PROJECT MANAGER:  Sisk