Miesian Plaza, Dublin

Miesian Plaza Street View Image Building Image 1 rev 2

Winthrop have been appointed to carry out the Mechanical, Electrical and Fire Protection works on this redevelopment of an existing commercial site into a modern business campus with the highest specification office space. The project when completed will comprise of 3 blocks c/w basement with a combined internal area of 34,610m2.

Works include:

Our scope includes a full new shell and core installation as well as a full developer fitout of each floor. A high quality of services and finishes combined with a LEED Platinum objective is our clients’ requirement.

Services include heating, chilled water, ventilation water services, soils & waste as well as a dedicated carpark ventilation system. Electrically high specification lighting throughout will be provided as well as all power and protective services.

SCOPE OF WORKS:  Mechanical & Electrical Contractor
PROJECT VALUE: € 17m
DURATION: 12 Months

PROJECT TEAM
ARCHITECT: Scott Tallon Walker
CONSULTING ENGINEER: Arup
QUANTITY SURVEYOR: Kerrigan Sheanon Newman
MAIN CONTRACTOR: John Paul Construction