Blackrock Clinic, Dublin

med-blackrock-clinic01 med-blackrock-clinic02 med-blackrock-clinic03

DESCRIPTION OF WORKS:

Winthrop has provided both mechanical and Electrical services to Blackrock Clinic since 2003. The works began with the relocation of the energy centre and proceeded on to include the 3 storey extension to the hospital building, full upgrade to the ground floor and reception, carpark, new A&E and pharmacy upgrades. Subsequent multiphase projects included the refurbishment of levels 1 and 2 in the hospital as well as a new Cathlab, CSSD, CDU, new and extended ICU and MRI. Existing theatre plantroom have also been fully refitted. A pre-requisite for all of these projects was the requirements to carry out the works within a live environment so the hospital could continue to function. The various projects were carried out with different project teams.

SCOPE OF WORKS: Mechanical & Electrical
SECTOR:   Medical
CLEINT:   Blackrock Clinic
VALUE:    €19,000,000
DURATION: Works ongoing since 2003

PROJECT TEAM
ARCHITECT:  Scott Tallon Walker / CCH
CONSULTING ENGINEER: Parker Wilson Consulting / MacArdle McSweeney Associates
QUANTITY SURVEYOR:  Bruce Shaw / JC Hogan
MAIN CONTRACTOR: Walls Construction / John Sisk & Sons